Final inspection

February 23rd, 2009 by jack
1 comment

Today - February 23 - exactly 12 weeks to the day after demolition, the chief building inspector for Somerville came by and signed off on the kitchen project.  I happened to be home waiting for a delivery and I can tell you that the “final inspection” consists of about 120 seconds of glancing around the room, followed by a signature on the building permit, and that’s it.  It does mean that we can take the ‘S’ placard out of the front window and consider the project officially complete.

Except, of course, for the tile.  If you’ve read the blog all along you may remember all of the issues that we had with tile, first choosing it, then finding an installer at an acceptable price.  We ended up taking the tile backsplash out of the original project, but we did go ahead and order the tile that we had chosen, just so we would have it when we found someone to install it.  That’s the delivery that I was waiting for today - coincidentally it arrived precisely on the last day of the “renovation” part of the project.

And, we actually have a meeting with a tile installer tomorrow.  If all goes well, we’ll be scheduling installation on that ASAP.  Then the kitchen will truly be done the way we envisioned it back in August.  Yes, we’ve been at this since August.  June if you count the initial search for a designer.

Below are some photos taken tonight, after all the little details were completed and we’d been using the kitchen for a couple of weeks.  Nothing too different from the last set.  At some point I’ll put together some direct before/after comparisons from different angles and post them here or in Picasa.

Thanks everyone for reading and for all of your interest in our little project.  I’ll probably post one or two more times when the tile is done and maybe some before/after pictures.

Main wall

Main wall

Second wall

Second wall

Main wall other way

Main wall other way

Back corner with pantry cabinet and window seat

Back corner with pantry cabinet and window seat

Coffee central

Coffee central

Sink corner

Sink corner

Prized sleeping spot

Prized sleeping spot

Populated dry bar cabinet

Populated dry bar cabinet

Open dry bar with lighting

Open dry bar with lighting

Uncategorized , ,

Insulated just in time for the snowstorm

December 19th, 2008 by jack
1 comment

Yesterday was the TripAdvisor/Smarter Travel Media holiday party so I didn’t have a chance to post.  The best thing about yesterday was that the electrical and building inspections were crossed off the long list of visits required by the City of Somerville.  That cleared the way for installation of insulation today and - hooray! - walls early next week.

The room looks very pink now:

Pink insulation in the outside wall

Pink insulation in the outside wall

The insulation in the roof had to be replaced because the previous stuff didn’t meet building code for cathedral ceilings.  Apparently what we needed was “R30″ insulation.  That means nothing to me, but it’s there now.

R30 insulation in the upper ceiling

R30 insulation in the upper ceiling

All of this happened just in time for the first big snowstorm of the season.  It’s been pretty cold in the house lately, with the kitchen completely un-insulated.  Now we should be warm and toasty like we were before.

Another new touch that was added today is a directional piece on the light fixture at the back of the room.  Now the light points straight down, rather than into the room at the angle of the ceiling.  It’s much brighter and (I think) means that we don’t have to move the light farther back in the ceiling.  Here’s a closeup:

Pointed downward, not inward

Pointed downward, not inward

Less glamorous but still exciting is that the gas line for the cooktop was installed yesterday.  There’s a short back story on it: apparently the gas line that we had running to the old stove was too small to provide enough gas to the new cooktop.  The plumber had to run a larger line off our furnace in the basement to fuel the five 15,000 BTU burners and one 9,000 BTU burner that are part of the one we’re having installed.  I don’t know how much a BTU is, but that sounds like a lot of them.

Endless BTUs

Endless BTUs

Lastly, I couldn’t resist posting this picture of nasty red goop that’s sealing the base of each basement penetration along the wall:

Red goop

Red goop

I’m assuming this is to keep cold air from the basement from flowing up into the kitchen walls.  This in particular is around one of the drain vent pipes.  Yuck!

The next thing to do is to put the walls up and plaster them.  No more open walls!

Got take out from Cambridge Common for dinner tonight.  I was there for a couple of beers after work.  They have a southern fried chicken dish with biscuits and mashed potatoes that is really excellent, even after a short drive through the snow.  Still very little momentum for cooking at home, though Anne’s been eating microwaveable macaroni and cheese this past week.  That and coffee are just about it.

Uncategorized , , , , , ,

Decisions and duct work

December 15th, 2008 by jack
No comments

Today’s most visible bit of progress is the new duct running from the future vent hood to the eventual outside vent:

Duct for vent hood running next to the support beam

Duct for vent hood running next to the support beam

As soon as the outdoor vent cap arrives, we’ll have a hole cut in our outside wall and siding and the duct covered on the outside.  Then we can redirect all of the smoke and steam from the cooktop to the outside.  Hopefully not the aroma of what’s cooking though.  No need to share too much with the squirrels.

The duct was installed by Mike the carpenter, who also finished up the ceiling frames and marked up the electrical changes that will be made in the next couple of days.  That’s maybe the most significant bit of progress today: I spent some time this morning with George and Mike ironing out all of the outstanding questions about lighting and wiring.  The electrician will be back tomorrow and/or Wednesday to finish things up, with an electrical inspection to follow by the end of the week.  Having all of that resolved is a huge relief.

Markup on ceiling straps for lighting installation

Markup on ceiling straps for lighting installation

There’s a ton to do in the next few days: finishing up electrical work and the electrical inspection; building inspection for all the new framing; drywall and plaster installation and inspection for that; and finalizing details on tile and installation for that.  We also need to make sure we’re on track for countertop templating and delivery once the cabinets are in.

Speaking of which, the cabinets arrive a week from today!  Ruskin tells me that we’re just about ready for them.

What are all these weird markings on the floor?

What are all these weird markings on the floor?

Anne and I had a nice dinner at Temple Bar tonight.  Last night was pizza and wings from Andrea’s in Somerville.  Seriously, if I come out of this project under 300 pounds, it will be a major accomplishment.

Uncategorized , , , ,

More on the new support beam, and bracing for cabinets

December 5th, 2008 by jack
1 comment

So I had a request for more info on the big support beam we had installed yesterday.  I’ll try to describe the issue and show some more detailed pictures.

As I mentioned in my earlier post, our upstairs bathroom sits on top of the kitchen, but it only covers about half of the room.  The other half is where we have a higher ceiling in the back of the kitchen.  At the back of of the bathroom, a load-bearing wall across what is now the kitchen must have been removed at some point.  No replacement support for the upper floor was added.

Now, I don’t believe that the upper floor was completely unsupported because we never had any settling or or instability up there.  I think it just wasn’t supported in a way that met modern building codes.  It looked like the framing of the upper floor may have been attached to the side of some large support columns on one side, but there was nothing supporting it directly from underneath.  The bottom of the upper floor looked like this:

Kitchen ceiling

Kitchen ceiling

Unfortunately I don’t seem to have any pictures of the sides of the upper floor, where it meets the two kitchen walls.  Just the photo above, which shows what the main part of the ceiling looked like before the changes.  The old strapping, about 3 inches’ worth, was removed, lessening the amount that we would have to lower the ceiling to accommodate the beam.

Yesterday, the new support was installed across the kitchen.  It’s the large, medium-colored horizontal beam in this photo:

New support beam

New support beam

It’s now sitting underneath the back of the upstairs bathroom.  The old wood above the beam in the photo is the outside of the bathroom.  On what would be the left side of the photo above, it’s supported by a large column that was already part of the structure.  A notch was cut out of the column and the beam was set into it, like so:

Left-side support for new beam

Left-side support for new beam

The existing column is the ancient-looking wooden piece in the lower-right.  A new 2×4 was also placed to the left, presumably to add extra bracing to keep the beam in the notch.  The three horizontal slats below the beam are unfinished strapping for the ceiling to the right.

On the right side of the first photo, a new support column had to be built.  It consists of three 2×4s stacked together and placed alongside part of the brick wall.  You can only see one of the three 2×4s (the others are stacked behind it), and there’s a lot of other stuff going on in this photo, but here’s what it looks like:

Right side support for new beam

Right side support for new beam

Again on this side, there’s an extra 2×4 to support the outside of the beam and hold it in place horizontally.  The plywood over top of the column is extra support for cabinets.

In the end, we lowered the ceiling below the bathroom by about 6 inches.  The old ceiling was somewhere around 9 feet, so we’ve still got an 8 1/2-foot ceiling in that part of the kitchen.  Not too bad.

Progress today was less dramatic.  There’s a lot of that plywood bracing for cabinets:

Plywood supports for cabinets

Plywood supports for cabinets

And the plumbing for the sink was moved:

A very exciting picture of new pipes

A very exciting picture of new pipes

I am pleased to report that we have had daily inspections and have, to my knowledge, passed them all.  Every day when he’s allowed downstairs, Ruskin heads straight for the kitchen and sniffs everything from new construction to floor protectors to tools that the workers left behind for the night.  As far as I know, his only complaint has been that it’s “different.”

The inspector at work

The inspector at work

Also today, Anne had her LASIK enhancement.  We ordered from Redbones and ate in near-darkness to avoid hurting her eyes.  Afterward I finally washed some dishes in the upstairs bathroom.  It was awkward without a drying rack.  I was constantly worried about clogging the drain with the little amount of food left on the plates.  And I just know I’m going to drop a bunch of glasses trying to carry them up and down the stairs all the time.  Maybe plastic is best.