Running water, refrigeration, and more finishing touches
In the past couple of days our home has zipped through the 19th and into the 20th century with the re-addition of running water and refrigeration. The kitchen sink works, as does the fridge including water filter and ice maker, which means that plumbing is done.
Today it was the electrician’s turn to finish some things off. Recessed lights got new collars (cats were jealous) and some of the outlets and switches were installed, but most interestingly, the pendant lamp was hung over the sink. Finally some light in the corner!
More stuff happened with the cabinets too. A lot more of the crown molding is in, as you can see on the far-right cabinet in the photo above. For a better view, here’s a close-up of the upper cabinets above the laptop station (along with the finished-off recessed light):
Tomorrow more cabinetry work will be done, including hopefully some of the finish work on the dry bar. Thursday and Friday should be the last days for the electrician, after which all of the appliances should work. I am pretty excited to have a dishwasher again.
Tonight I really wanted Chinese food, which is just a terrible idea if you have to eat out every night. We should be focused on healthy options because most take-out is decidedly unhealthy. But we’re not. I got General Gau’s Chicken. When this is all over we’ll have a brand-new kitchen but eat nothing by salads for a month.










